Virginia keeps adding people, especially in Northern Virginia, the Richmond region and Hampton Roads, and nobody can lock the door against newcomers. The real choice facing counties and cities is not whether to grow but where and how: outward, in low-density subdivisions reached by ever-wider roads, or upward, in compact districts built around rail stations and bus lines. Arlington’s Rosslyn-Ballston corridor became a national model of the second approach, while much of the state’s suburban fringe illustrates the first. This page looks at the vocabulary of the debate, the places where Virginia has tried to plan ahead, and the laws and budgets that shape what is possible.
Quick answer: “Sprawl” describes low-density development spreading across farms and forest beyond existing towns, usually with little reinvestment in older centers; “smart growth” concentrates homes, jobs and shops near transit so that fewer new road lanes are needed. Virginia examples of the planned approach include the Rosslyn-Ballston Metro corridor in Arlington, the 2010 Tysons plan tied to the Silver Line (opened in 2014 and extended to Dulles Airport and Ashburn in 2022), transit-oriented plans in Herndon and at the Vienna station, the Virginia Beach Green Line (1979) and the rural policy areas of Loudoun and Prince William counties. Virginia localities can zone, plan and buy or transfer development rights, but the state has no general law letting them hold back building permits until schools and roads are adequate.[1][2][3]
Contents
- What sprawl means
- What smart growth means
- The Rosslyn-Ballston corridor
- Tysons and the Silver Line
- Vienna, Herndon and transit-oriented development
- Columbia Pike and Richmond Highway
- Lane-miles: the price of more pavement
- Level of Service: grading congestion
- New highways open new land
- What Virginia law allows
- Drawing a line: rural areas and growth boundaries
- Richmond, Henrico and Route 5
- Roads follow rooftops
- Buying and moving development rights
- Timeline
- Frequently asked questions
What sprawl means
Planners use “sprawl” for growth that spreads thinly over land outside existing cities and towns: large lots, separated uses (homes in one place, stores in another, offices in a third), and a street pattern that makes a car necessary for nearly every trip. Sprawl is usually paired with neglect at the center, as older downtowns and inner suburbs lose investment while the fringe gains it. Development also tends to leapfrog, with a subdivision appearing wherever a farmer sells, leaving gaps of farmland between new neighborhoods and stretching every water line, school bus route and road.
The key decisions behind a given pattern are made long before bulldozers arrive. Where should growth go? How dense should it be? Which areas get homes, which get offices or stores? Which future roads are drawn on the county map? Those choices are typically settled five to fifteen years ahead in comprehensive plans, transportation plans and rezonings, so by the time neighbors see a field being cleared, the outcome is usually locked in. See population density and land use in Virginia for how rezoning works on the suburban edge.
What smart growth means
Smart growth is the umbrella term for the opposite approach. Its advocates argue that spotty, uncoordinated development is expensive, because schools, roads and even sewage treatment plants end up in the wrong places at the wrong times, and taxpayers pay for the mismatch. They propose instead to:
- cluster housing, shopping and jobs so that many trips are short;
- offer a mix of housing types, from apartments to townhouses to single-family homes;
- put the densest buildings within walking distance of a rail station or frequent bus line;
- serve commuters with transit rather than widening highways for cars carrying one person each; and
- keep parks and green space within walking distance of homes.
In practice, the centerpiece of most smart growth plans in Virginia is a cluster of high-rise apartments and offices around a Metrorail station.
The Rosslyn-Ballston corridor
Arlington’s Rosslyn-Ballston corridor is the state’s best-known smart growth story. In the late 1960s, as the regional subway was being planned, Wilson Boulevard was a struggling commercial strip losing shoppers to new suburban malls. County leaders saw the coming Metro line as a chance to attract growth, but only in selected places. After a long public planning process, Arlington rezoned the land around each of the five stations in the corridor (Rosslyn, Court House, Clarendon, Virginia Square and Ballston), required a mix of offices and housing in walkable buildings, and stepped heights down toward the older single-family neighborhoods, which were left largely as they were.[4]
The results became a textbook case. Between 1970 and 2000 about 15 million square feet of office space and 15,000 housing units were built on roughly 2 square miles of land in a county that had been considered built out. The corridor covers about 7.6% of Arlington’s land but, by the late 2000s, produced about a third of its real estate tax revenue.[4] Arlington’s population, about 160,000 in 1960, reached 238,643 in the 2020 Census, making it the second-densest jurisdiction in Virginia.[4][5] The corridor is a rare case in which a county’s plan, rather than individual landowners’ requests, decided in advance where decades of growth would go. See Metrorail in Virginia.
Tysons and the Silver Line
Fairfax County’s biggest bet on building up rather than out is Tysons, which grew from a crossroads into an office and shopping hub after Tysons Corner Center opened in 1968.[6] By the 2000s Tysons had more jobs than many cities but few residents, wide arterial roads and almost no walkable streets.
The Silver Line changed the equation. To help pay for it, Fairfax County created a Phase 1 transportation improvement district in 2004 and a Phase 2 district in 2009, special tax districts that levy an extra tax on commercial and industrial property near the line. On June 22, 2010, the Board of Supervisors adopted a new Comprehensive Plan for Tysons, and at the same time created a new zoning district, the Planned Tysons Corner Urban District, allowing much greater density near the four Tysons stations, a finer street grid and a shift toward housing so that Tysons would become a place to live as well as work.[7][8]
Phase 1 of the Silver Line opened on July 26, 2014, linking East Falls Church with Tysons and Reston. Phase 2 opened on November 15, 2022, extending service west through Herndon to Washington Dulles International Airport and Ashburn in Loudoun County, with six new stations.[9]
Vienna, Herndon and transit-oriented development
Transit-oriented development, or TOD, means mixed-use, higher-density building within a short walk (roughly a quarter to a half mile) of a station, so that residents and workers can ride instead of drive. It took Fairfax County decades after Arlington’s success to apply the idea at its own Orange Line stations. Near the Vienna/Fairfax-GMU station, the county changed its Comprehensive Plan in 2004 and approved MetroWest in March 2006, replacing an older subdivision with plans for 2,248 attached homes, 300,000 square feet of offices and 190,000 square feet of other commercial space. The homes came first; the offices and much of the retail were still unbuilt in 2021, when Pulte sought revised plans.[10][11]
The Town of Herndon prepared for its own station years in advance. In 2012 it adopted a plan for the area just outside the Herndon station, now called the Herndon Transit-Oriented Core, and rewrote its zoning in 2013 to allow large mixed-use buildings there.[12] The station opened with Silver Line Phase 2 in 2022. On April 23, 2024, the town council unanimously adopted a second plan for the 94-acre Transit-Related Growth Area just north of the core, which envisions about 5.4 million square feet of development, including 2,789 homes, as a step down in intensity toward the single-family neighborhoods beyond.[13] The town’s bet is that growth next to the station can add residents and jobs without gridlock on local streets.
Columbia Pike and Richmond Highway
Not every transit plan survives. Arlington and Fairfax counties spent years planning a streetcar along Columbia Pike, from Skyline in Fairfax County to Pentagon City, combined with a second line through Crystal City for a 7.4-mile system. The idea was that rail would draw developers to replace the low buildings along the Pike with mid-rise mixed-use buildings, shops on the ground floor and apartments above. After an election in which a streetcar opponent won a County Board seat, Arlington Board chairman Jay Fisette announced on November 18, 2014, that the county would end the project.[14] Redevelopment along the Pike continued, served by buses.
In Fairfax County, the Embark Richmond Highway plan pairs new zoning along U.S. 1 with a widened road and a bus rapid transit line, branded “The One,” with nine stations from the Huntington Metrorail station to Fort Belvoir, running in dedicated lanes along Richmond Highway.[15] The same logic applies: transit is cheaper per rider than new road lanes only if enough people live and work close to it. See bus rapid transit in Virginia.
Lane-miles: the price of more pavement
Transportation plans are written in a technical language that keeps many residents out of the conversation. The basic unit of road capacity is the lane-mile: one lane, one mile long. Widening a two-lane road to four lanes for five miles adds two new lanes times five miles, or ten lane-miles. Every lane-mile must be designed, built, plowed, repaved and eventually rebuilt, so suburban growth that depends on adding lanes commits a region to decades of maintenance spending.
Big crossings are the most expensive lane-miles of all. The replacement of the Woodrow Wilson Bridge, which carries the Capital Beltway over the Potomac between Alexandria and Prince George’s County, Maryland, with two 12-lane drawbridges plus new interchanges, was estimated by the Federal Highway Administration at $2.5 billion, of which $1.6 billion was federal money.[16] Proposals for additional Potomac crossings upstream and downstream, which would open more of Maryland and Virginia to commuting, have resurfaced for decades.
Level of Service: grading congestion
Traffic engineers grade roads and intersections with a Level of Service, or LOS (pronounced as three letters), from A to F. LOS A means free-flowing traffic; A, B and C all describe flowing conditions; F means stop-and-go near gridlock. The grade usually reflects the worst congestion of the day, even if it lasts only a few minutes.[17]
County plans set a target grade, and the target drives the budget. A county that accepts LOS D at rush hour needs far fewer new lane-miles and interchanges than one that insists on LOS C, which on growing suburban corridors can be impossibly expensive. Critics argue that chasing a better grade simply widens roads that soon fill up again, while smart growth plans try to accept some congestion in exchange for walkable, transit-served places. See transportation planning in Virginia.
New highways open new land
Highways do not just serve growth; they create it. The proposed Bi-County Parkway, an extension of Route 234 around Manassas National Battlefield Park that would link Prince William County with Loudoun County and the Dulles area, shows how fiercely that is debated. In June 2013 the Commonwealth Transportation Board designated a North-South Corridor of Statewide Significance including the route, while the Prince William board removed the road from its list of priorities sent to VDOT. Opposition came from battlefield preservationists, residents along Pageland Lane and smart growth advocates. Prince William later removed the parkway from its comprehensive plan, and by 2018 the project was considered off the table, though officials still sought another north-south link.[18][19][20] The Pageland Lane corridor then became the site of the Digital Gateway data center fight described in population density and land use in Virginia.
What Virginia law allows
Virginia localities have substantial powers to plan and zone. Every locality must adopt a comprehensive plan, and the U.S. Supreme Court settled the legality of zoning itself in Village of Euclid v. Ambler Realty Co. (1926), holding that a zoning ordinance is a valid exercise of the police power unless it is “clearly arbitrary and unreasonable” and unrelated to public health, safety, morals or general welfare.[21][22] That ruling means a county can zone farmland for very low density, even though the decision lowers what the land would fetch from a developer, without paying owners compensation.
What Virginia counties lack is a general power to slow growth by withholding building permits until roads, schools and other public facilities can handle it, the tool often called an adequate public facilities ordinance. Instead, counties have relied on proffers, the cash and improvements developers offer when seeking a rezoning. In 2016 the General Assembly sharply narrowed residential proffers: offsite proffers, including all cash proffers, may only address needs that are specifically attributable to the new homes, and only for schools, transportation, public safety and parks.[23] Counties can shape where growth goes; they have few legal tools to stop it.
Drawing a line: rural areas and growth boundaries
The other half of concentrating growth is designating places where it should not go and spending little on infrastructure there. A growth boundary is easiest to draw when development pressure is low. As population climbs, the gap in land prices on either side of the line grows, and so does the pressure to move it.
- Prince William County. For decades the county’s plan designated a Rural Area, often called the Rural Crescent, across its western half. The Board of County Supervisors adopted a new comprehensive plan, Pathway to 2040, in December 2022.[24] Data center proposals along Pageland Lane and the debate over a road to Dulles have kept the rural edge under steady pressure.
- Virginia Beach. Princess Anne County and the small resort city of Virginia Beach merged on January 1, 1963, creating a “city” that was mostly farms and woods.[25] In 1979 city leaders adopted the policies now known as the Green Line, an urban development boundary running mainly along Princess Anne Road; a second boundary, the Blue Line along Indian River Road, marks the start of the rural south, with a Transition Area between them. About 26,000 acres of the city are still actively farmed, and agriculture remains its third-largest industry after tourism and the military.[26] Growth is directed instead to the city’s center, including Town Center. A plan to extend Norfolk’s light rail line, The Tide, to Town Center failed when voters rejected it 57% to 42% in a November 2016 referendum.[27]
- Loudoun County. The 2019 General Plan, adopted June 20, 2019, divides the county into Suburban, Transition, Urban and Rural policy areas. The western two-thirds of the county forms the Rural Policy Area, meant for farming, rural businesses and limited housing, while eastern Loudoun around Ashburn, Sterling and the Dulles communities takes most new growth.[28][29] The logic is the one smart growth advocates describe everywhere: two-lane country roads, some of them still gravel, cannot carry suburban commuter traffic, so road money and dense zoning go together in the east.
Richmond, Henrico and Route 5
In the Richmond region, new housing downtown and along the riverfront puts residents within walking or biking distance of jobs and needs little new road capacity. Development farther out in eastern Henrico County is different. Route 5, New Market Road, runs east from the city through the historic Varina district toward Charles City County. In September 2011 a consultant’s study proposed converting it from two lanes to a four-lane divided highway, and in 2012 Preservation Virginia placed the New Market Road Corridor on its list of the state’s most endangered historic places, noting that the approach to Richmond through eastern Henrico crosses some of Virginia’s most historic land.[30]
Richmond and Henrico are separate governments with separate plans, and regional transportation planning has long assumed that the state will pay to widen roads serving new subdivisions. That assumption dates to the Byrd Road Act of 1932, under which the state took over the secondary roads of Virginia’s counties. Henrico and Arlington are the only counties that kept responsibility for their own secondary roads, an arrangement that is unusual among the 50 states.[31]
Roads follow rooftops
Real estate agents say that retail follows rooftops: supermarkets, pharmacies and takeout restaurants arrive once enough households live nearby to support them. Many suburban developers have assumed that roads follow rooftops too, and that once enough voters live along a congested two-lane road, the state will widen it.
That assumption weakened as gasoline tax revenue stagnated and the cost of maintaining aging roads and bridges rose, leaving less money for new construction. In 2013 the General Assembly passed a major transportation funding law (Chapter 766 of the 2013 Acts of Assembly), which also created dedicated regional funds, including the Northern Virginia Transportation Authority Fund.[32] Regional money has since paid for many projects, but the gap between the cost of serving scattered growth and the money available remains a central argument for smart growth.
Buying and moving development rights
Virginia law offers two market-based tools to shift growth away from rural land. Under a transfer of development rights (TDR) program, a locality designates sending areas, where landowners sell their rights to build, and receiving areas, where buyers may use those rights to build at higher density than base zoning allows.[33][34] Under a purchase of development rights (PDR) program, a locality or land trust pays owners to place permanent conservation easements on farms and forests. The state’s farmland preservation office develops model PDR policies and criteria for certifying local programs to receive public funds.[35]
By concentrating density in some places and limiting it in others, these tools can reduce the lane-miles a region needs, or push density high enough to justify new transit. See farmland loss in Virginia.
Timeline
| Year | Event |
|---|---|
| 1926 | Euclid v. Ambler upholds zoning as a use of the police power |
| 1932 | Byrd Road Act puts county secondary roads under the state |
| 1963 | Princess Anne County and Virginia Beach merge |
| 1968 | Tysons Corner Center opens |
| 1970–2000 | Rosslyn-Ballston corridor adds about 15 million sq. ft. of offices and 15,000 homes |
| 1979 | Virginia Beach adopts Green Line policies |
| 2004, 2009 | Silver Line special tax districts created in Fairfax County |
| 2006 | MetroWest approved at Vienna Metro station |
| 2010 | Tysons Comprehensive Plan adopted |
| 2012 | Herndon station area plan adopted; New Market Road Corridor listed as endangered |
| 2013 | State transportation funding law; Bi-County Parkway debate peaks |
| 2014 | Silver Line Phase 1 opens; Columbia Pike streetcar cancelled |
| 2016 | Proffer law narrowed; Virginia Beach voters reject light rail extension |
| 2019 | Loudoun adopts 2019 General Plan |
| 2022 | Silver Line Phase 2 opens; Prince William adopts Pathway to 2040 |
| 2024 | Herndon adopts Transit-Related Growth Area plan |
Frequently asked questions
What is the best example of smart growth in Virginia? Arlington’s Rosslyn-Ballston corridor, where dense development was concentrated near five Metro stations while surrounding neighborhoods kept their character.[4]
When did the Silver Line reach Dulles Airport? Phase 2, including the Dulles Airport station, opened on November 15, 2022.[9]
Was the Columbia Pike streetcar built? No. Arlington ended the project in November 2014.[14]
What is the Virginia Beach Green Line? An urban development boundary, adopted in 1979 and running mainly along Princess Anne Road, that limits dense development in the rural south of the city.[26]
Can a Virginia county stop new development until schools and roads catch up? Generally not. Virginia has no adequate public facilities law of that kind, and the 2016 proffer law limits what counties can ask of residential developers.[23]
What do LOS A and LOS F mean? They are the best and worst grades for traffic flow: free movement at A, stop-and-go congestion at F.[17]
See also: population of Virginia, urban population growth in Virginia, highways in Virginia, transit in Virginia.
References
- Metropolitan Washington Airports Authority, “Project Background,” Dulles Corridor Metrorail Project. https://mwaa.com/business/construction/dulles-corridor-metrorail/dullesmetro-overview/project-background
- City of Virginia Beach, “Where We Draw the Line: Rural Preservation, the Green Line and the Blue Line,” September 9, 2025. https://virginiabeach.gov/connect/blog/where-we-draw-the-line-rural-preservation-the-green-line-and-the-blue-line
- Code of Virginia § 15.2-2303.4, Provisions applicable to certain conditional rezoning proffers. https://law.lis.virginia.gov/vacode/15.2-2303.4
- Smart Growth America, “Arlington, Virginia’s story of smart growth: The movie,” May 8, 2009. https://www.smartgrowthamerica.org/knowledge-hub/news/arlington-virginias-story-of-smart-growth-the-movie/
- U.S. Census Bureau, “2020 Census Urban and Rural County Classification.” https://www2.census.gov/geo/docs/reference/ua/2020_UA_COUNTY.xlsx
- Fairfax County Public Library, “Local History Timeline.” https://research.fairfaxcounty.gov/local-history/timeline
- Fairfax County, “Tysons Plan Timeline.” https://www.fairfaxcounty.gov/tysons/tysons-plan-timeline
- Federal Highway Administration, “Silver Line/Dulles Metrorail Special Assessment District,” Value Capture case study. https://www.fhwa.dot.gov/ipd/value_capture/case_studies/silver_line_dulles_metrorail_special_assessment_district.aspx
- Metropolitan Washington Airports Authority, “Project Background.” https://mwaa.com/business/construction/dulles-corridor-metrorail/dullesmetro-overview/project-background ; WMATA, “Silver Line grand opening.” https://www.wmata.com/news/silver-line-grand-opening.html
- Connection Newspapers, “Big Day for a Big Project,” February 21, 2006. https://www.connectionnewspapers.com/news/2006/feb/21/big-day-for-a-big-project
- Tysons Reporter, “With site plans in review, MetroWest developers promise retail is coming to Vienna Metro area,” November 30, 2021. https://www.tysonsreporter.com/2021/11/30/with-site-plans-in-review-metrowest-developers-promise-retail-is-coming-to-vienna-metro-area/
- FFXnow, “Town of Herndon prepares for Metro with plan for more growth, density,” June 28, 2022. https://www.ffxnow.com/2022/06/28/town-of-herndon-prepares-for-metro-with-plan-for-more-growth-density/
- FFXnow, “Herndon cements vision for development of transition zone near Metro station,” May 1, 2024. https://www.ffxnow.com/2024/05/01/herndon-transit-related-growth-area-plan-adoption/
- UrbanTurf, “Columbia Pike and Crystal City Streetcar Cancelled,” November 18, 2014. https://dc.urbanturf.com/articles/blog/columbia_pike_and_crystal_city_streetcar_cancelled/9235
- Fairfax County Department of Transportation, “Richmond Highway BRT: Project Background.” https://www.fairfaxcounty.gov/transportation/richmond-hwy-brt/background
- Federal Highway Administration, PlanWorks case study, “Woodrow Wilson Bridge.” https://fhwaapps.fhwa.dot.gov/planworks/Reference/CaseStudy/8
- Transportation for America, “Level of service,” May 22, 2023. https://t4america.org/resource/community-connectors/what-they-mean/level-of-service/
- Commonwealth Transportation Board, resolution on the North-South Corridor of Statewide Significance, June 2013. https://ctb.virginia.gov/media/ctb/agendas-and-meeting-minutes/2013/june/reso2/Resolution_Agenda_Item_11_NorthSouthStudy.pdf
- Potomac Local, “Bi-County Parkway Dropped from Prince William’s VDOT Priorities List,” June 5, 2013. https://www.potomaclocal.com/2013/06/05/bi-county-parkway-dropped-from-vdot-priorities-list
- Coalition for Smarter Growth, “Bi-County Parkway off the table, but policymakers still seek north-south fix,” February 16, 2018. https://www.smartergrowth.net/news-parent/news/bi-county-parkway-off-the-table-but-policymakers-still-seek-north-south-fix/
- Code of Virginia § 15.2-2223, Comprehensive plan to be prepared and adopted. https://law.lis.virginia.gov/vacode/15.2-2223/
- Cornell Law School, Legal Information Institute, “Village of Euclid v. Ambler Realty (1926).” https://www.law.cornell.edu/wex/village_of_euclid_v_ambler_realty_%281926%29 ; full text: https://www.law.cornell.edu/supremecourt/text/272/365
- Code of Virginia § 15.2-2303.4. https://law.lis.virginia.gov/vacode/15.2-2303.4
- Prince William County, “Pathway to 2040: Comprehensive Plan Update.” https://www.pwcva.gov/news/pathway-2040-comprehensive-plan-update
- City of Virginia Beach, “Year in Review: Reflecting on our 60th Year,” December 29, 2023. https://virginiabeach.gov/connect/blog/year-in-review-reflecting-on-our-60th-year
- City of Virginia Beach, “Where We Draw the Line: Rural Preservation, the Green Line and the Blue Line.” https://virginiabeach.gov/connect/blog/where-we-draw-the-line-rural-preservation-the-green-line-and-the-blue-line
- WTKR, “Light rail referendum in Virginia Beach fails,” November 9, 2016. https://www.wtkr.com/2016/11/09/light-rail-referendum-in-virginia-beach-fails/
- Loudoun County GIS, “Policy Areas of Loudoun County, VA” (metadata). https://logis.loudoun.gov/metadata/RGP%20Policy%20areas.html
- Loudoun County, “Loudoun County Comprehensive Plan.” https://www.loudoun.gov/4957/Loudoun-County-Comprehensive-Plan
- WTVR, “List of most endangered historic sites in Virginia unveiled,” May 7, 2012. https://www.wtvr.com/2012/05/07/list-of-most-endangered-historic-sites-in-virgina-unveiled
- Virginia Transportation Research Council, “Beyond the Byrd Road Act: VDOT’s Relationship with Virginia’s Urban Counties,” Report 98-R29, 1998. https://vtrc.virginia.gov/reports/all-reports/98-r29/
- Code of Virginia § 33.2-2509, Northern Virginia Transportation Authority Fund (history: 2013, c. 766). https://law.lis.virginia.gov/vacode/33.2-2509/
- Code of Virginia § 15.2-2316.1, Definitions (transfer of development rights). https://law.lis.virginia.gov/vacode/title15.2/chapter22/section15.2-2316.1
- Code of Virginia § 15.2-2316.2, Localities may provide for transfer of development rights. https://law.lis.virginia.gov/vacode/15.2-2316.2/
- Code of Virginia § 10.1-1119.3, Powers and duties of the Office; Virginia Farmland and Forestland Preservation Fund. https://law.lis.virginia.gov/vacode/10.1-1119.3