Wind has worked for Virginians for four centuries, first in the sails of ships and the arms of gristmills, now in turbines taller than any building in the state. Yet for a long time Virginia was a wind-power laggard. Neighboring states built mountain wind farms in the 2000s and 2010s while Virginia’s proposals died in county zoning fights. The state’s breakthrough came offshore, in the Atlantic off Virginia Beach, and only in the mid-2020s on land.
Quick answer: The best wind resources in Virginia are off the Atlantic coast and on high western ridges. Two test turbines, about 12 megawatts in total, began operating 27 miles off Virginia Beach in 2020, the first wind turbines in U.S. federal waters. Dominion Energy’s full Coastal Virginia Offshore Wind (CVOW) project, about 2.6 gigawatts with 176 turbines, is designed to power up to 660,000 homes. On land, Virginia had no commercial wind farm until construction began on Rocky Forge Wind in Botetourt County in 2025.[1][2][3][4]
Contents
- Where wind comes from
- Sails and windmills
- Where Virginia’s wind is strongest
- Taller towers, bigger turbines
- Two decades of mountain proposals
- Rocky Forge: Virginia’s first onshore wind farm
- Birds, bats and other impacts
- Offshore wind
- Costs, utilities and regulation
- Timeline
- Frequently asked questions
Where wind comes from
Wind is really a form of solar energy. The sun heats the earth unevenly; land and water, mountains and valleys warm at different rates; and the rotating planet sets air moving in large patterns. As long as the sun shines, the wind will blow somewhere.[5] For a turbine, what matters is how fast and how steadily the air moves at the height of its blades, because the power available rises steeply with wind speed: doubling the speed multiplies the power roughly eightfold.
Sails and windmills
The English colonists arrived on wind-powered ships, and for two centuries sailing vessels connected Virginia to Europe, Africa and the Caribbean. On land, wind ground grain. The first documented windmill in English North America was built around 1621 at Flowerdew Hundred on the James River, under Governor George Yeardley.[6][7] A visitor’s account from the 1640s counted only a handful of windmills and watermills in the colony, but windmills spread in flat Tidewater, where streams were too sluggish for waterwheels. Yorktown, Hampton and Norfolk all had them, usually on bluffs or open shorelines; a windmill drawn at Yorktown at the time of the 1781 siege survived into the 19th century. Later, metal-bladed farm windmills pumped well water on rural properties until rural electrification made them unnecessary (see early energy in Virginia).
Where Virginia’s wind is strongest
Not every place is windy enough for a commercial turbine. Developers generally look for sites with average wind speeds of at least about 12 miles per hour at hub height. State wind resource mapping has found the best potential in three areas: the oceanfront from Virginia Beach up the Eastern Shore, the crests of the mountains in the northern-central part of Virginia, and the highest ridges near the state lines with West Virginia and North Carolina.
On land, elevation matters. Because the jet stream usually runs north of Virginia, the height at which ridges become windy enough rises toward the south: a ridge that is good for wind in Highland County must be much higher near the North Carolina line. The Piedmont and inland Coastal Plain have few good sites. Much of the mountain potential is also on national forest or national park land, where development is difficult or prohibited.[1] Industry sources describe good Virginia mountain sites as needing elevations above roughly 2,300 feet.[8]
Offshore, the wind is stronger and steadier, with no hills or trees to slow it, and the continental shelf off Virginia is wide and shallow enough for turbines fixed to the seabed.
Taller towers, bigger turbines
Wind near the ground is slowed by friction with trees, buildings and terrain, so turbines are mounted on tall towers. Modern onshore turbines reach 500 to 700 feet from base to blade tip, and offshore units are taller still. Taller machines catch faster, steadier wind and produce cheaper power, but they are visible for many miles, especially on a ridgeline. They also need new access roads and transmission lines, which can fragment forests. These trade-offs explain most of the conflict over wind power in Virginia.
Two decades of mountain proposals
Virginia’s first serious wind farm proposals came in the mid-2000s, and almost all of them stalled:
- Highland County (2005–2007). A plan for up to about 20 turbines on a ridge above 4,000 feet, which would have been among the highest wind farms in the country, won local and state approval after years of lawsuits pitting tourism and scenery against renewable energy, but was never built.
- Patrick County (2006). When a developer eyed ridges near Meadows of Dan and Patrick Springs, county supervisors quickly adopted an emergency height limit that effectively barred large turbines.
- Roanoke County (2010). A proposal for turbines on Poor Mountain drew landowner opposition and was shelved.
- Tazewell County (2009–2015). Dominion bought about 2,600 acres on East River Mountain for a planned 80-megawatt wind farm, but the county adopted ridgeline height restrictions to block it. Dominion still owned roughly 2,500 acres there in 2021.[8]
- Carroll County (2012–2020). A developer planned some 20 turbines on Stoots Mountain and obtained federal aviation clearance after agreeing to lighting that would not interfere with military night-vision training.
- Grayson County (2021). A proposal for a handful of turbines on Buck and Whitetop mountains divided residents.
Meanwhile, by 2021 West Virginia had about 742 megawatts of onshore wind capacity and North Carolina and Maryland about 200 megawatts each, while Virginia had none.[8]
Rocky Forge: Virginia’s first onshore wind farm
The proposal that finally succeeded was Rocky Forge Wind, on North Mountain near Eagle Rock in Botetourt County. Apex Clean Energy leased land on the remote ridge in the mid-2010s. The site had strong winds, few close neighbors and an existing transmission line along the mountain, so no new corridor had to be cut. Botetourt County adopted a wind ordinance and approved the project, though residents of neighboring Rockbridge County, who would see the turbines, objected.
The project then spent most of a decade in delays. Turbine technology advanced, so Apex asked to build fewer, taller machines; in 2020 the county raised the maximum height from 550 to 680 feet by a narrow vote.[8] Opponents sued over state environmental permits, a county official ruled a permit had lapsed, and the developer struggled to find a long-term buyer for the power. State regulators required the turbines to stop spinning on warm nights when bats are most active.
Construction finally began in early 2025, with Google and Apex buying all of the electricity. The wind farm, planned at about 75 to 80 megawatts from 13 or 14 turbines, was expected to power about 21,000 homes and be fully operational by 2026.[4][8]
Birds, bats and other impacts
Turbine blades kill birds and, especially, bats. Studies estimate hundreds of thousands of bird deaths a year at U.S. wind farms, and bat deaths that may be higher still, since migrating tree bats seem drawn to turbines. Still, collisions with buildings, power lines and vehicles, and predation by cats, kill far more birds than turbines do. The most effective mitigation for bats is “curtailment”: keeping blades still at low wind speeds, when bats are most active and little power would be produced anyway, which can cut bat deaths substantially. Eagles are a particular concern on Appalachian ridges, and Virginia regulators have required eagle studies for mountain projects.
Other concerns include low-frequency noise, shadow flicker, aviation safety lighting and the effect of turbines on scenic views and tourism. County ordinances in Virginia typically set height limits, setbacks from homes and property lines, and noise standards at the property line.
Offshore wind
Offshore wind is where Virginia moved first. In 2020 two turbines built by Ørsted for Dominion Energy were installed about 27 miles off Virginia Beach, the first wind turbines in U.S. federal waters. The 12-megawatt Coastal Virginia Offshore Wind pilot has been fully operating since fall 2020 and serves as a test bed for the commercial lease area next to it.[2]
The commercial project, also called CVOW, is far larger: about 2.6 gigawatts from 176 turbines in a federal lease area adjacent to the pilot, starting about 27 miles offshore. Dominion says that when complete it will deliver up to about 9.5 million megawatt-hours a year, enough for as many as 660,000 homes, and support about 1,100 jobs.[3][1] The Virginia Clean Economy Act of 2020 declared offshore wind of this scale to be in the public interest, which smoothed regulatory approval, though the project’s cost, passed on to Dominion customers through a rate rider, has been closely watched (see electricity in Virginia).
Hampton Roads leaders also see offshore wind as a new maritime industry for a region built on shipbuilding and ports (see Port of Virginia).
Costs, utilities and regulation
Wind’s fuel is free, but turbines, foundations and transmission are expensive up front. In Virginia’s regulated system, the State Corporation Commission must approve generating plants that a utility adds to its rate base, and it normally weighs cost against alternatives. The General Assembly has repeatedly declared wind and solar to be in the public interest, which tips that balance. Large corporate buyers, who want to match their data-center electricity with renewable power, are increasingly signing contracts directly, as Google did for Rocky Forge. Some Virginia companies buy wind power from distant states instead; the climate effect is the same even though the electricity itself never reaches Virginia.
Timeline
| Year | Event |
|---|---|
| c. 1621 | First documented windmill in English North America at Flowerdew Hundred |
| 1781 | Windmills stand at Yorktown and Hampton during the Revolutionary War |
| 2005–2007 | Highland County wind farm approved after lawsuits, never built |
| 2010 | Tazewell County adopts ridgeline height limits |
| 2020 | Two CVOW pilot turbines installed off Virginia Beach; Virginia Clean Economy Act passed |
| 2021 | West Virginia has 742 MW of onshore wind; Virginia has none |
| 2025 | Construction begins on Rocky Forge Wind in Botetourt County |
| 2026 | Target for full operation of Rocky Forge and completion of CVOW |
Frequently asked questions
Does Virginia have wind farms? Offshore, yes: two pilot turbines have operated since 2020 and the large CVOW project is being completed. On land, Rocky Forge Wind in Botetourt County began construction in 2025.[2][3][4]
Where is the best wind in Virginia? Off the Atlantic coast and on high ridges in the western mountains, especially from Highland County northward.[1]
How big is Coastal Virginia Offshore Wind? About 2.6 gigawatts, with 176 turbines starting 27 miles off Virginia Beach, enough for up to 660,000 homes.[1][3]
Why did Virginia take so long to build onshore wind? Scenic and tourism concerns, county height limits, wildlife issues, transmission costs and low electricity prices all slowed projects.
Where was the first windmill in Virginia? At Flowerdew Hundred on the James River, around 1621.[6]
See also: energy in Virginia, solar power in Virginia, the Chesapeake Bay in Virginia.
References
- U.S. Energy Information Administration, “Virginia: State Profile and Energy Estimates – Analysis.” https://www.eia.gov/state/analysis.php?sid=VA
- Bureau of Ocean Energy Management, “Coastal Virginia Offshore Wind Project (CVOW) Research Project.” https://www.boem.gov/renewable-energy/state-activities/coastal-virginia-offshore-wind-project-cvow
- Dominion Energy, “Coastal Virginia Offshore Wind.” https://www.dominionenergy.com/projects-and-facilities/wind-power-facilities-and-projects/coastal-virginia-offshore-wind
- WSLS 10, “Construction begins on Botetourt County wind farm,” February 3, 2025. https://www.wsls.com/news/local/2025/02/03/construction-begins-on-botetourt-county-wind-farm/
- U.S. Department of Energy, “Wind Energy Basics.” https://www.energy.gov/eere/wind/wind-energy-basics
- National Park Service, “Flowerdew Hundred Plantation.” https://www.nps.gov/articles/flowerdew.htm
- Virginia Department of Historic Resources, “074-0006 Flowerdew Hundred.” https://www.dhr.virginia.gov/historic-registers/074-0006/
- Cardinal News, “Why don’t we have more wind energy in Southwest Virginia? Or any?” November 23, 2021. https://cardinalnews.org/2021/11/23/why-dont-we-have-more-wind-energy-in-southwest-virginia-or-any/